This
months topic is the actual construction of your spa. If you
have done your homework and have worked in conjunction with your
spa consultant and interior designer or architect you should be
well prepared. The more detail on the design and specs the clearer
it will be to get bids that will not be susceptible to huge overruns
and misunderstandings with the builder.
It's time to decide
whether to choose a general contractor whose job it will be to coordinate
the entire job including carpentry, electrical, plumbing, tile,
painting, finish details, etc. or to be your own construction manager
(general contractor) if you want to bid out and coordinate all of
the subcontractors, do most of the pricing, purchasing, and scheduling
yourself. You will have to also get the permits as an owner/builder.
I would only recommend this if your job is a renovation and if you
have construction or management experience. You will also be responsible
for the quality control of your own job. This may also take away
from your spa operation planning; but, could save you as much as
10% to 20% of the construction cost.
Whether or not you use a general contractor or not you will still
be shopping for the best quality for the least price. You should
get at least 3 bids from reputable general contractors, or if you
are the general contractor get 3 bids from each subcontractor. If
your plans and specs are well prepared the lowest bid will work
fine.
However, if your plans are not well detailed a low bid could actually
cost you more in the end if there are changes needed that are not
detailed enough on the plans. For example if the concrete floor
is poured and your floor drain is in the wrong place, the wrong
size, or forgotten because the equipment was not specified there
could be a major extra cost. Sometimes a low bidder can see that
your plans are not clear enough and will come in with a low bid
knowing he will get the job but make up for the low bid on the extras
and change orders and at the same time not have to be accountable
for delays. In any case make sure you know the hourly rate you will
pay in case of changes. It is also very important to require a finished
date with a penalty clause if the work is not completed on time.
You should time your construction to be finished about two to fours
weeks before your opening so there is a little cushion and also
a training period scheduled in. This gives an overlap that will
give you the option to train in your own place if the building is
done on time or if there is more time required for construction
you still could do off site training. (It is much better to do the
training on site) The extra cost of an offsite training facility
rental should be figured into the cost of non-performance to be
paid by the contractor. You should also keep an ongoing punch list
of incomplete work and withhold a part of your final payment till
such work is completed. There should also be a workmanship guarantee
clause-especially for plumbing, electrical, and mechanical
problems that could arise as a result of improper installation or
inferior materials.
Make sure that you completely understand your contract before you
sign. If you have any questions that your builder cannot explain
and you cannot understand, you probably should get legal advice
before you sign. You should also have your spa consultant review
your contract and final contract plans before you sign just to be
sure. If you been very independently creative and have not hired
a spa consultant from the beginning now is the last chance before
very costly mistakes could be avoided before construction begins.
Another important bit of advice is to make sure the contractor is
licensed and insured including liability and workmans comp.
It is actually legally possible that you could be liable for personal
or property damages caused by a construction accident even if you
are leasing the property.
Dont forget to put up your coming soon signs to
let the public know what is coming; because, next month we will
change gears and start to talk about the actual business operations
master planning. .